Lifting equipment ranges from small hoists used on the assembly lines to the large cranes employed to change dies in the bodywork press shop.
Three major upgrades have been performed to date, the latest being the refurbishment of a 30t crane, originally installed in 1991, with electronic controllers dating back to the 1980s.