The cranes will service part of the upgraded electro-winning plant within the complex, handling anode copper plate as well as cathode starter sheets and the pure end product.
To be installed by EC Mining astride a railway line servicing wagon trains within the refinery, the cranes have been designed with double cantilevers off their 4.5m spans to pack and stack sheet product adjacent to the tracks.
condra